Changes for page h. Test SFT1: System baseline test
Last modified by Rosa Van Tuijn on 2026/04/13 12:47
From version 1.9
edited by Tjalling Haije
on 2026/03/23 14:31
on 2026/03/23 14:31
Change comment:
There is no comment for this version
To version 1.22
edited by Tjalling Haije
on 2026/03/24 09:21
on 2026/03/24 09:21
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -h. Test SFT1 1 +h. Test SFT1: System baseline test - Content
-
... ... @@ -1,9 +1,9 @@ 1 1 **Experiment title** 2 - [Short, descriptive title]2 +System baseline test 3 3 4 4 5 5 **2. Objective / Research Question** 6 -Do the SYNERGISE technologies together improve the belowSYNERGISE [[Objectives>>2\. Specification.Objectives.WebHome]] without negative effects?6 +Do the SYNERGISE technologies together improve the SYNERGISE [[Objectives>>2\. Specification.Objectives.WebHome]] (stated below) without negative effects? 7 7 8 8 1. Mission effectiveness 9 9 1. Mission efficiency ... ... @@ -10,7 +10,6 @@ 10 10 1. FR Health 11 11 1. FR and victim safety 12 12 13 - 14 14 **3. Hypotheses / Expectations (optional)** 15 15 See the claims from [[UC04.3: Detailed indoor exploration with ANYMAL (USAR)>>2\. Specification.b\. Use Cases.UC04\.0\: Detailed indoor exploration.UC04\.3\: Detailed indoor exploration with ANYMAL (USAR).WebHome]], being: 16 16 ... ... @@ -22,7 +22,6 @@ 22 22 * CL06: improved FR health 23 23 * CL07: degraded mission efficiency 24 24 25 - 26 26 **4. Scenario / Context** 27 27 ASR3: Detailed indoor exploration 28 28 ... ... @@ -34,7 +34,6 @@ 34 34 ** **ANYmal **is mission-ready (battery, controls, and payload checked). 35 35 ** **C3I is online**, role-based views are configurated (Operator/ Analyst/ Team leader/ Safety officer); **5G pods** are installed for connection. 36 36 37 - 38 38 **5. Participants** 39 39 40 40 * FR team ROBOT: ... ... @@ -107,7 +107,6 @@ 107 107 * FR Team ROBOT does Building B 108 108 * FR team HUMAN does Building A 109 109 110 - 111 111 **9. Measurements** 112 112 113 113 See the measurements from [[UC04.3: Detailed indoor exploration with ANYMAL (USAR)>>2\. Specification.b\. Use Cases.UC04\.0\: Detailed indoor exploration.UC04\.3\: Detailed indoor exploration with ANYMAL (USAR).WebHome]] ... ... @@ -115,14 +115,17 @@ 115 115 116 116 **10. Procedure (Step-by-Step)** 117 117 118 -1. Preparation:114 +1. __Team preparation__: 119 119 11. FR team ROBOT is trained in operating the robot, analysing the camera stream, and pinning information on C3I 120 120 11. Squad leader and BoO are trained for both teams in interpreting the health and location sensor data. 121 121 11. Experiment leader knows where hazards and victims are in both buildings. 122 -1. Briefing: 118 +11. Anymal robot is tested with network in target buildings for experiment (without FR themselves seeing building!) 119 +1. __Experiment preparation:__ 120 +11. Building is prepped with victims, hazards, etc. 121 +1. __Briefing:__ 123 123 11. Same for both teams for both building types: Building has been inspected from outside and is estimated safe for entry. Situation inside unknown. Victims possibly present. Goal: find, assess, and extract victims while avoiding and mapping hazards. 124 124 11. One person is notified that their health sensor will be triggered during the Building B (difficult building) situation. 125 -1. Execution: 124 +1. __Execution:__ 126 126 11. For FR team ROBOT, see: [[UC04.3: Detailed indoor exploration with ANYMAL (USAR)>>2\. Specification.b\. Use Cases.UC04\.0\: Detailed indoor exploration.UC04\.3\: Detailed indoor exploration with ANYMAL (USAR).WebHome]] 127 127 11. For FR team HUMAN, see: [[UC04.4: Detailed indoor exploration without ANYMAL (USAR)>>2\. Specification.b\. Use Cases.UC04\.0\: Detailed indoor exploration.UC04\.3\: Detailed indoor exploration with ANYmal (USAR).WebHome]] 128 128 11. During execution of both teams, performance will be measured by experiment leader: ... ... @@ -130,32 +130,64 @@ 130 130 111. Health indicators stay within acceptable range 131 131 111. Time for tackling any health alerts 132 132 111. Track FR path 133 -1. Hotwash: 134 -11. Questions on: 132 +1. __Hotwash__: 133 +11. Questions (specified per role, couple questions per topic) on: 135 135 111. Near-incident report 136 136 111. Path inside 137 137 111. FR location and status of hazards, victims, and layout 138 -111. Mission effectiveness 137 +111. Mission effectiveness ? Decision Making effectiveness? 139 139 111. Self-reported workload 140 140 111. Trust survey 140 +11. Group discussion with feedback 141 141 142 +**~11. Planning:** 142 142 143 -**~11. Materials / Setup Components** 144 -[List equipment, environment layout, props, simulation assets] 144 +* Team preparation: Day before. 1 hour. 145 +* Trial 1: 146 +** Setup scenario: Test day 1. 09:00 - 09:30 147 +** Setup tech and perform checks: Test day 1. 09:00 - 09:30 148 +** Briefing of each team individually (outside building): Test day 1: 09:00 - 09:30 149 +** Mission execution: Test day 1. 09:30 - 10:30 150 +** Hot wash: Test day 1. 10:30-11:00 151 +** Scenario reset: test day 1. 10:30-11:00 152 +* Teams switch location: Test day 1. 11:00-11:15 153 +* Trial 2: 154 +** Setup scenario: Test day 1. 12:30 - 13:00 155 +** Setup tech and perform checks: Test day 1. 12:30 - 13:00 156 +** Briefing of each team individually (outside building): Test day 1: 12:30 - 13:00 157 +** Mission execution: Test day 1. 13:00 - 14:00 158 +** Hot wash: Test day 1. 14:00-14:30 159 +** Cleanup area and store tech. 14:00-14:30 145 145 146 146 147 -**13. Location & Duration** 148 148 149 -* Location: [Where does it take place?] 150 -* Duration: [Total time per run + preparation] 163 +**12. Materials** 151 151 165 +* For FRs: 166 +** 1x Anymal with teleop setup and networking 167 +** 2x Tablet with C3I for squad leader (one spare) 168 +** 1x Base of Operations with computer with C3I 169 +** 4x Health sensors 170 +** 4x Location sensors 171 +** 8x walky talky with two channels (?) (for FR team and BoO). 172 +* For usecase: 173 +** 2x training building (~~100m2?) 174 +** Enviromental challenges: smoke machine, obstacles, etc. 175 +** ~~8x Actors or dummies for victims. 176 +* 8x Clipboards with papers and pens for hotwash and questionnaires 152 152 153 -**14. Dependencies** 154 -[Other WPs, required assets, system availability, permissions] 178 +**13. Dependencies** 155 155 180 +* Availability of materials 181 +* Availability and functioning of ANYmal robot with teleoperation and network in target buildings 182 +* Availability of functioning network between robot, FRs, and BoO. 183 +* Availability of: 184 +** Experiment participants 185 +** People willing to play victim 186 +** Experiment leaders 156 156 157 -**1 5. Success Criteria**158 - [Howdo youknowthe experimentworkedasintended?]188 +**14. Success Criteria** 189 +When mission(s) completed by both teams, and we can compare their performance using the metrics. 159 159 160 160 161 161