Changes for page h. Test SFT1: System baseline test
Last modified by Rosa Van Tuijn on 2026/04/13 12:47
From version 1.9
edited by Tjalling Haije
on 2026/03/23 14:31
on 2026/03/23 14:31
Change comment:
There is no comment for this version
To version 1.11
edited by Tjalling Haije
on 2026/03/23 15:10
on 2026/03/23 15:10
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -96,6 +96,7 @@ 96 96 97 97 * Building A: Easier location, obstacles and environmental conditions. (clear visibility, ..) 98 98 * Building B: Challenging location, obstacles and environmental conditions for humans and robots (e.g. smoke and obstacles). 99 +* 99 99 100 100 Trial 1: 101 101 ... ... @@ -115,10 +115,12 @@ 115 115 116 116 **10. Procedure (Step-by-Step)** 117 117 118 -1. Preparation:119 +1. Team training: 119 119 11. FR team ROBOT is trained in operating the robot, analysing the camera stream, and pinning information on C3I 120 120 11. Squad leader and BoO are trained for both teams in interpreting the health and location sensor data. 121 121 11. Experiment leader knows where hazards and victims are in both buildings. 123 +1. Usecase preparation 124 +11. Building is prepped with victims, hazards, etc. 122 122 1. Briefing: 123 123 11. Same for both teams for both building types: Building has been inspected from outside and is estimated safe for entry. Situation inside unknown. Victims possibly present. Goal: find, assess, and extract victims while avoiding and mapping hazards. 124 124 11. One person is notified that their health sensor will be triggered during the Building B (difficult building) situation. ... ... @@ -139,17 +139,32 @@ 139 139 111. Self-reported workload 140 140 111. Trust survey 141 141 145 +Planning: 142 142 143 -**~11. Materials / Setup Components** 144 -[List equipment, environment layout, props, simulation assets] 147 +* Team training: Day before. 1 hour. 148 +* Trial 1: 149 +** Setup usecase: Test day 1. 09:00 - 09:30 150 +** Setup tech and perform checks: Test day 1. 09:00 - 09:30 151 +** Briefing of each team individually (outside building): Test day 1: 09:00 - 09:30 152 +** Mission execution: Test day 1. 09:30 - 10:30 153 +** Hot wash: Test day 1. 10:30-11:00 154 +** Usecase reset: test day 1. 10:30-11:00 155 +* Teams switch location: Test day 1. 11:00-11:15 156 +* Trial 2: 157 +** Setup usecase: Test day 1. 12:30 - 13:00 158 +** Setup tech and perform checks: Test day 1. 12:30 - 13:00 159 +** Briefing of each team individually (outside building): Test day 1: 12:30 - 13:00 160 +** Mission execution: Test day 1. 13:00 - 14:00 161 +** Hot wash: Test day 1. 14:00-14:30 162 +** Cleanup area and store tech. 14:00-14:30 145 145 146 146 147 -**13. Location & Duration** 148 148 149 -* Location: [Where does it take place?] 150 -* Duration: [Total time per run + preparation] 151 151 167 +**~11. Materials / Setup Components** 168 +[List equipment, environment layout, props, simulation assets] 152 152 170 + 153 153 **14. Dependencies** 154 154 [Other WPs, required assets, system availability, permissions] 155 155