Last modified by Rosa Van Tuijn on 2026/04/13 12:47

From version 1.9
edited by Tjalling Haije
on 2026/03/23 14:31
Change comment: There is no comment for this version
To version 1.10
edited by Tjalling Haije
on 2026/03/23 14:57
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -96,6 +96,7 @@
96 96  
97 97  * Building A: Easier location, obstacles and environmental conditions. (clear visibility, ..)
98 98  * Building B: Challenging location, obstacles and environmental conditions for humans and robots (e.g. smoke and obstacles).
99 +*
99 99  
100 100  Trial 1:
101 101  
... ... @@ -139,17 +139,19 @@
139 139  111. Self-reported workload
140 140  111. Trust survey
141 141  
143 +Planning:
142 142  
143 -**~11. Materials / Setup Components**
144 -[List equipment, environment layout, props, simulation assets]
145 +|Step|Time
146 +| |
147 +| |
145 145  
146 146  
147 -**13. Location & Duration**
148 148  
149 -* Location: [Where does it take place?]
150 -* Duration: [Total time per run + preparation]
151 151  
152 +**~11. Materials / Setup Components**
153 +[List equipment, environment layout, props, simulation assets]
152 152  
155 +
153 153  **14. Dependencies**
154 154  [Other WPs, required assets, system availability, permissions]
155 155