Changes for page h. Test SFT1: System baseline test
Last modified by Rosa Van Tuijn on 2026/04/13 12:47
From version 1.13
edited by Tjalling Haije
on 2026/03/23 15:21
on 2026/03/23 15:21
Change comment:
There is no comment for this version
To version 1.10
edited by Tjalling Haije
on 2026/03/23 14:57
on 2026/03/23 14:57
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -116,13 +116,10 @@ 116 116 117 117 **10. Procedure (Step-by-Step)** 118 118 119 -1. Team preparation:119 +1. Preparation: 120 120 11. FR team ROBOT is trained in operating the robot, analysing the camera stream, and pinning information on C3I 121 121 11. Squad leader and BoO are trained for both teams in interpreting the health and location sensor data. 122 122 11. Experiment leader knows where hazards and victims are in both buildings. 123 -11. Anymal robot is tested with network in target buildings for experiment (without FR themselves seeing building!) 124 -1. Experiment preparation 125 -11. Building is prepped with victims, hazards, etc. 126 126 1. Briefing: 127 127 11. Same for both teams for both building types: Building has been inspected from outside and is estimated safe for entry. Situation inside unknown. Victims possibly present. Goal: find, assess, and extract victims while avoiding and mapping hazards. 128 128 11. One person is notified that their health sensor will be triggered during the Building B (difficult building) situation. ... ... @@ -145,52 +145,21 @@ 145 145 146 146 Planning: 147 147 148 -* Team preparation: Day before. 1 hour. 149 -* Trial 1: 150 -** Setup usecase: Test day 1. 09:00 - 09:30 151 -** Setup tech and perform checks: Test day 1. 09:00 - 09:30 152 -** Briefing of each team individually (outside building): Test day 1: 09:00 - 09:30 153 -** Mission execution: Test day 1. 09:30 - 10:30 154 -** Hot wash: Test day 1. 10:30-11:00 155 -** Usecase reset: test day 1. 10:30-11:00 156 -* Teams switch location: Test day 1. 11:00-11:15 157 -* Trial 2: 158 -** Setup usecase: Test day 1. 12:30 - 13:00 159 -** Setup tech and perform checks: Test day 1. 12:30 - 13:00 160 -** Briefing of each team individually (outside building): Test day 1: 12:30 - 13:00 161 -** Mission execution: Test day 1. 13:00 - 14:00 162 -** Hot wash: Test day 1. 14:00-14:30 163 -** Cleanup area and store tech. 14:00-14:30 145 +|Step|Time 146 +| | 147 +| | 164 164 165 165 166 166 167 -**~11. Materials** 168 168 169 -* For FRs: 170 -** 1x Anymal with teleop setup and networking 171 -** 2x Tablet with C3I for squad leader (one spare) 172 -** 1x Base of Operations with computer with C3I 173 -** 4x Health sensors 174 -** 4x Location sensors 175 -** 8x walky talky with two channels (?) (for FR team and BoO). 176 -* For usecase: 177 -** 2x training building (~~100m2?) 178 -** Enviromental challenges: smoke machine, obstacles, etc. 179 -** ~~8x Actors or dummies for victims. 180 -* 8x Clipboards with papers and pens for hotwash and questionnaires 152 +**~11. Materials / Setup Components** 153 +[List equipment, environment layout, props, simulation assets] 181 181 182 182 183 183 **14. Dependencies** 157 +[Other WPs, required assets, system availability, permissions] 184 184 185 -* Availability of materials 186 -* Availaibility and functioning of ANYmal robot with teleoperation and network in target buildings 187 -* Availability of functioning network between robot, FRs, and BoO. 188 -* Availability of: 189 -** Experiment participants 190 -** People willing to play victim 191 -** Experiment leaders 192 192 193 - 194 194 **15. Success Criteria** 195 195 [How do you know the experiment worked as intended?] 196 196