Changes for page h. Test SFT1: System baseline test
Last modified by Rosa Van Tuijn on 2026/04/13 12:47
From version 1.12
edited by Tjalling Haije
on 2026/03/23 15:15
on 2026/03/23 15:15
Change comment:
There is no comment for this version
To version 1.13
edited by Tjalling Haije
on 2026/03/23 15:21
on 2026/03/23 15:21
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -116,11 +116,12 @@ 116 116 117 117 **10. Procedure (Step-by-Step)** 118 118 119 -1. Team training:119 +1. Team preparation: 120 120 11. FR team ROBOT is trained in operating the robot, analysing the camera stream, and pinning information on C3I 121 121 11. Squad leader and BoO are trained for both teams in interpreting the health and location sensor data. 122 122 11. Experiment leader knows where hazards and victims are in both buildings. 123 -1. Usecase preparation 123 +11. Anymal robot is tested with network in target buildings for experiment (without FR themselves seeing building!) 124 +1. Experiment preparation 124 124 11. Building is prepped with victims, hazards, etc. 125 125 1. Briefing: 126 126 11. Same for both teams for both building types: Building has been inspected from outside and is estimated safe for entry. Situation inside unknown. Victims possibly present. Goal: find, assess, and extract victims while avoiding and mapping hazards. ... ... @@ -144,7 +144,7 @@ 144 144 145 145 Planning: 146 146 147 -* Team training:Day before. 1 hour.148 +* Team preparation: Day before. 1 hour. 148 148 * Trial 1: 149 149 ** Setup usecase: Test day 1. 09:00 - 09:30 150 150 ** Setup tech and perform checks: Test day 1. 09:00 - 09:30 ... ... @@ -180,8 +180,14 @@ 180 180 181 181 182 182 **14. Dependencies** 183 -[Other WPs, required assets, system availability, permissions] 184 184 185 +* Availability of materials 186 +* Availaibility and functioning of ANYmal robot with teleoperation and network in target buildings 187 +* Availability of functioning network between robot, FRs, and BoO. 188 +* Availability of: 189 +** Experiment participants 190 +** People willing to play victim 191 +** Experiment leaders 185 185 186 186 187 187 **15. Success Criteria**