Changes for page h. Test SFT1: System baseline test
Last modified by Rosa Van Tuijn on 2026/04/13 12:47
From version 1.11
edited by Tjalling Haije
on 2026/03/23 15:10
on 2026/03/23 15:10
Change comment:
There is no comment for this version
To version 1.10
edited by Tjalling Haije
on 2026/03/23 14:57
on 2026/03/23 14:57
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -116,12 +116,10 @@ 116 116 117 117 **10. Procedure (Step-by-Step)** 118 118 119 -1. Team training:119 +1. Preparation: 120 120 11. FR team ROBOT is trained in operating the robot, analysing the camera stream, and pinning information on C3I 121 121 11. Squad leader and BoO are trained for both teams in interpreting the health and location sensor data. 122 122 11. Experiment leader knows where hazards and victims are in both buildings. 123 -1. Usecase preparation 124 -11. Building is prepped with victims, hazards, etc. 125 125 1. Briefing: 126 126 11. Same for both teams for both building types: Building has been inspected from outside and is estimated safe for entry. Situation inside unknown. Victims possibly present. Goal: find, assess, and extract victims while avoiding and mapping hazards. 127 127 11. One person is notified that their health sensor will be triggered during the Building B (difficult building) situation. ... ... @@ -144,22 +144,9 @@ 144 144 145 145 Planning: 146 146 147 -* Team training: Day before. 1 hour. 148 -* Trial 1: 149 -** Setup usecase: Test day 1. 09:00 - 09:30 150 -** Setup tech and perform checks: Test day 1. 09:00 - 09:30 151 -** Briefing of each team individually (outside building): Test day 1: 09:00 - 09:30 152 -** Mission execution: Test day 1. 09:30 - 10:30 153 -** Hot wash: Test day 1. 10:30-11:00 154 -** Usecase reset: test day 1. 10:30-11:00 155 -* Teams switch location: Test day 1. 11:00-11:15 156 -* Trial 2: 157 -** Setup usecase: Test day 1. 12:30 - 13:00 158 -** Setup tech and perform checks: Test day 1. 12:30 - 13:00 159 -** Briefing of each team individually (outside building): Test day 1: 12:30 - 13:00 160 -** Mission execution: Test day 1. 13:00 - 14:00 161 -** Hot wash: Test day 1. 14:00-14:30 162 -** Cleanup area and store tech. 14:00-14:30 145 +|Step|Time 146 +| | 147 +| | 163 163 164 164 165 165