Changes for page h. Test SFT1: System baseline test
Last modified by Rosa Van Tuijn on 2026/04/13 12:47
From version 1.10
edited by Tjalling Haije
on 2026/03/23 14:57
on 2026/03/23 14:57
Change comment:
There is no comment for this version
To version 1.12
edited by Tjalling Haije
on 2026/03/23 15:15
on 2026/03/23 15:15
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -116,10 +116,12 @@ 116 116 117 117 **10. Procedure (Step-by-Step)** 118 118 119 -1. Preparation:119 +1. Team training: 120 120 11. FR team ROBOT is trained in operating the robot, analysing the camera stream, and pinning information on C3I 121 121 11. Squad leader and BoO are trained for both teams in interpreting the health and location sensor data. 122 122 11. Experiment leader knows where hazards and victims are in both buildings. 123 +1. Usecase preparation 124 +11. Building is prepped with victims, hazards, etc. 123 123 1. Briefing: 124 124 11. Same for both teams for both building types: Building has been inspected from outside and is estimated safe for entry. Situation inside unknown. Victims possibly present. Goal: find, assess, and extract victims while avoiding and mapping hazards. 125 125 11. One person is notified that their health sensor will be triggered during the Building B (difficult building) situation. ... ... @@ -142,15 +142,39 @@ 142 142 143 143 Planning: 144 144 145 -|Step|Time 146 -| | 147 -| | 147 +* Team training: Day before. 1 hour. 148 +* Trial 1: 149 +** Setup usecase: Test day 1. 09:00 - 09:30 150 +** Setup tech and perform checks: Test day 1. 09:00 - 09:30 151 +** Briefing of each team individually (outside building): Test day 1: 09:00 - 09:30 152 +** Mission execution: Test day 1. 09:30 - 10:30 153 +** Hot wash: Test day 1. 10:30-11:00 154 +** Usecase reset: test day 1. 10:30-11:00 155 +* Teams switch location: Test day 1. 11:00-11:15 156 +* Trial 2: 157 +** Setup usecase: Test day 1. 12:30 - 13:00 158 +** Setup tech and perform checks: Test day 1. 12:30 - 13:00 159 +** Briefing of each team individually (outside building): Test day 1: 12:30 - 13:00 160 +** Mission execution: Test day 1. 13:00 - 14:00 161 +** Hot wash: Test day 1. 14:00-14:30 162 +** Cleanup area and store tech. 14:00-14:30 148 148 149 149 150 150 166 +**~11. Materials** 151 151 152 -**~11. Materials / Setup Components** 153 -[List equipment, environment layout, props, simulation assets] 168 +* For FRs: 169 +** 1x Anymal with teleop setup and networking 170 +** 2x Tablet with C3I for squad leader (one spare) 171 +** 1x Base of Operations with computer with C3I 172 +** 4x Health sensors 173 +** 4x Location sensors 174 +** 8x walky talky with two channels (?) (for FR team and BoO). 175 +* For usecase: 176 +** 2x training building (~~100m2?) 177 +** Enviromental challenges: smoke machine, obstacles, etc. 178 +** ~~8x Actors or dummies for victims. 179 +* 8x Clipboards with papers and pens for hotwash and questionnaires 154 154 155 155 156 156 **14. Dependencies** ... ... @@ -157,6 +157,7 @@ 157 157 [Other WPs, required assets, system availability, permissions] 158 158 159 159 186 + 160 160 **15. Success Criteria** 161 161 [How do you know the experiment worked as intended?] 162 162