Changes for page UC03.2: Wide area assessment (USAR)
Last modified by Tjalling Haije on 2025/09/15 09:25
From version 4.1
edited by Rosa Van Tuijn
on 2025/07/09 07:45
on 2025/07/09 07:45
Change comment:
There is no comment for this version
To version 14.1
edited by Tjalling Haije
on 2025/09/15 09:25
on 2025/09/15 09:25
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. RosaVanTuijn1 +XWiki.TjallingHaije - Content
-
... ... @@ -1,20 +1,53 @@ 1 -=== ** Widearea assessment –USAR** ===1 +=== **Indoor Drone Exploration and Victim Detection – Firefighting** === 2 2 3 -|=**Objective**|= 4 -|**TDP**| 5 -|**IDP**| 6 -|**Actors**| 7 -|**Pre-Condition**| 8 -|**Post-Condition**| 3 +|=**Objective**|=[[OB01: Increase effectiveness through exploration, sensing and communication means>>path:#]] 4 +[[OB04: Improve safety by providing overviews and warnings of environment conditions>>path:#]] 5 +|=**Description**|=Use RTK-enabled outdoor drones for wide area assessment before and during USAR operations. Drones hover near structures and provide high-resolution video, controlled manually by an operator. Teams and command staff use the footage to support planning, assess hazards, and make routing decisions. 6 +|**TDP**|TDP1, TDP4, TDP6 7 +|**IDP**|IDP1, IDP3 8 +|**Actors**|Drone Operator, USAR Rescuers, Command Center Staff, Camera Analyst (optional) (described at [[4. Personas & Problem Scenarios>>path:/bin/view/Main/sdf/4.%20Scenarios%20%26%20Personas/]] and [[Direct Stakeholders>>path:/bin/view/Main/sdf/Stakeholders/Direct/]]) 9 +|**Pre-Condition**|Drone is operational and connected; a need for external visual assessment is identified. 10 +|**Post-Condition**|Hazards and structures externally assessed; situational awareness increased across teams. 11 +|**Status**|Earlier version validated during CFT 2 9 9 10 10 11 11 12 ----- 13 - 14 14 === **Action Sequence** === 15 15 17 +1. **Deployment and Initial Positioning** 18 + a. Command or team lead requests drone support for external area overview. 19 + b. Drone operator launches drone, checks connectivity and RTK accuracy. 20 + c. Live feed is shared with teams and command center. 21 +1. **Initial Area Assessment** 22 + a. Drone hovers and performs a wide pass along the operational area. 23 + b. Camera operator or analyst identifies terrain features and visible hazards. 24 + c. Findings are noted by command staff for initial planning and worksite layout. 25 +1. **Detailed Look Upon Request** 26 + a. A responder team or command staff requests specific inspection (e.g. rooftop stability, exit blockage). 27 + b. Operator manually moves drone and zooms in for closer inspection. 28 + c. Team uses footage for tactical decision-making or confirmation before approach. 29 +1. **Data Sharing and Coordination** 30 + a. Screenshots or annotated video are shared across teams. 31 + b. Visual information is added to digital maps or discussed in team briefings. 32 + c. Drone remains in overwatch or is redirected to the next location. 33 + 16 16 ---- 17 17 18 - |=**Claims (title)**|=**Function**|=**Effect(s)**|=**Action Sequence Step(s)**36 +=== **Claims (title)** === 19 19 38 +|=Claims (title)|=Function|=Effect(s)|=Action Sequence Step(s) 39 +|CL1 Improved SA on environment for teams|Live video from hovering drone|EFXX: Situation Awareness improved of USAR team 40 +→ Measured with SAGAT or questionnaire. 41 +(Teams operate with up-to-date visuals of surroundings.)|2a, 2b, 3a 42 +|CL2 Safer team movement planning|Visual human confirmation of hazards|EFXX: Safety of responders improved 43 +→ Measured with near-incident reporting or field logs. 44 +(Avoids unstable paths or collapse zones.)|3a, 3b, 3c 45 +|CL3 Increased planning speed|Area scan before deployment|EFXX: Operational tempo (team efficiency) improved because experts (such as structural engineers) can watch along and classify safe entry points etc. 46 +→ Measured with time-to-plan or decision cycle.|2a, 2c, 4b 47 +|CL4 Lower workload for reconnaissance|Drone replaces physical scout|EFXX: Mental workload decreased 48 +→ Measured with NASA TLX. 49 +(Removes need for physical recon of rooftops or hard-to-access zones.)|2b, 3b 50 +|CL5 Shared SA between field and base|Feed shared across all actors|EFXX: Coordination improved 51 +→ Measured with mission replay or comms analysis.|1c, 4a, 4b 52 + 20 20