Changes for page UC03.2: Wide area assessment (USAR)
Last modified by Tjalling Haije on 2025/09/15 09:25
From version 11.1
edited by Tjalling Haije
on 2025/07/14 12:24
on 2025/07/14 12:24
Change comment:
There is no comment for this version
To version 13.1
edited by Tjalling Haije
on 2025/07/14 13:35
on 2025/07/14 13:35
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -42,7 +42,7 @@ 42 42 |CL2 Safer team movement planning|Visual human confirmation of hazards|EFXX: Safety of responders improved 43 43 → Measured with near-incident reporting or field logs. 44 44 (Avoids unstable paths or collapse zones.)|3a, 3b, 3c 45 -|CL3 Increased planning speed|Area scan before deployment|EFXX: Operational tempo (team efficiency) improved 45 +|CL3 Increased planning speed|Area scan before deployment|EFXX: Operational tempo (team efficiency) improved because experts (such as structural engineers) can watch along and classify safe entry points etc. 46 46 → Measured with time-to-plan or decision cycle.|2a, 2c, 4b 47 47 |CL4 Lower workload for reconnaissance|Drone replaces physical scout|EFXX: Mental workload decreased 48 48 → Measured with NASA TLX.